FIELD: railway maintenance and repair facilities. SUBSTANCE: bulldozer equipment has blade, pushing bars and fork. Tie accumulator in form of three-dimensional frame with rack-rocker is mounted on crawler truck. Fork turning mechanism is made in form of two hydraulic cylinders connected with pushing bars. Fork is essentially a U-shaped frame with rippers - pickups arranged behind the limits of dragging wedge edge. EFFECT: improved reliability of operation. 1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| WORKING TOOL FOR EARTHMOVING MACHINE | 1999 |
|
RU2163953C1 |
| BULLDOZER | 1999 |
|
RU2174573C2 |
| ANTICREEPING RAIL CHAIR | 1996 |
|
RU2125133C1 |
| STRAIGHTLY DIRECTING PIVOT MECHANISM | 1993 |
|
RU2075672C1 |
| SLIDER-CRANK MECHANISM | 1996 |
|
RU2110718C1 |
| DEVICE FOR DISPLACEMENT OF RAIL | 1995 |
|
RU2104361C1 |
| OPPOSITE CRANK-SLIDER MECHANISM | 1995 |
|
RU2085791C1 |
| MACHINE FOR CLEANING ROADBED SLOPES FROM BRUSH | 2000 |
|
RU2178479C2 |
| SLING TEST STAND | 1997 |
|
RU2119444C1 |
| PIVOT FOUR-LINK MECHANISM | 1994 |
|
RU2087779C1 |
Authors
Dates
1997-03-27—Published
1994-08-22—Filed