FIELD: methods and devices for utilization of residual heat, in particular, excess heat in flue gas (5) that is not required for operation of desulfurization plant of flue gas 8 admitted to the air heater and electrostatic precipitator (7). SUBSTANCE: air heating is accomplished by two air heaters (3,4) located in the main line of flue gases before and past electrostatic precipitator (7), and a partial flow (5a, 5c) of flue gas (5) corresponding to excess heat and used for steam generation is abstracted at least from one air heater (3,4). EFFECT: facilitated procedure. 10 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR RAISING POWER PLANT EFFICIENCY | 1994 |
|
RU2137046C1 |
COMBINED CYCLE METHOD FOR POWER GENERATING AND COMBINED-CYCLE PLANT IMPLEMENTING IT | 1993 |
|
RU2106501C1 |
METHOD OF WELDING OF COMB-LIKE SEALING STRAPS TO PLATE HEAT EXCHANGERS | 1995 |
|
RU2104848C1 |
METHOD AND DEVICE FOR OPERATING COMBINED-CYCLE PLANT (OPTIONS) | 1993 |
|
RU2109970C1 |
PLATE-TYPE HEAT EXCHANGER | 1992 |
|
RU2076295C1 |
BOILER PLANT AND METHOD OF OPERATION AND EQUIPPING OF BOILER PLANT | 2006 |
|
RU2380548C2 |
BOILER UNIT WITH FLUIDISED BED AND GAS PRE-HEATING METHOD FOR COMBUSTION IN BOILER UNIT WITH FLUIDISED BED | 2017 |
|
RU2733499C1 |
APPARATUS FOR PROCESSING COAL AND FOR PRODUCING ELECTRIC ENERGY AND GAS | 0 |
|
SU1058509A3 |
METHOD OF AND GAS TURBINE PLANT FOR CONTINUOUS CONVERSION OF ENERGY | 1991 |
|
RU2085754C1 |
INSTALLATION AND METHOD FOR HEAT TREATMENT OF WASTES | 1992 |
|
RU2088631C1 |
Authors
Dates
1997-05-10—Published
1993-03-19—Filed