FIELD: erecting gaslines. SUBSTANCE: method for recovering metal underground gasline includes cleaning its inner surface from rust, deposits, burrs, and placing inside it polyethylene pipe by drawing. Support layers of such a height to provide that the existing and new pipes be coaxial, are attached to lower surface of the pipe before drawing. Hardening composition is used to fill the annular space between the new and existing pipes. EFFECT: recovered serviceability of gas pipeline. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING GAS LINE IN HEAVING SOILS | 1994 |
|
RU2075682C1 |
GAS TRANSPORTATION DEVICE | 1994 |
|
RU2084754C1 |
METHOD OF FIXATION OF FLOATING-UP TWO-LINE GAS PIPING | 1995 |
|
RU2081365C1 |
METHOD FOR TRENCHLESS LAYING OF PIPELINES AND DIRECTED DRILLING MACHINE | 1996 |
|
RU2075574C1 |
DEVICE FOR FLAME MACHINING OF MATERIALS | 1994 |
|
RU2073594C1 |
ROOF COVERING | 1995 |
|
RU2127351C1 |
METHOD OF BORE-HOLE HYDRAULIC RECOVERY OF MINERALS | 1997 |
|
RU2107165C1 |
TEMPERATURE TRANSMITTER WITH SENSITIVE ELEMENT | 2002 |
|
RU2215271C1 |
ELECTRICALLY INSULATED TRACK BOND | 2000 |
|
RU2181809C2 |
DEVICE FOR WELLHEAD SEALING, UNIT OF SEALS AND UNIT OF STOP SLIPS | 1995 |
|
RU2088745C1 |
Authors
Dates
1997-05-20—Published
1994-10-03—Filed