FIELD: civil engineering. SUBSTANCE: this refers to housing construction and namely to reconstruction of low-story houses. First, house is subjected to examination by experts and decision is made about possibility of reconstruction of given house. At positive decision, first roofing is removed completely or partly. Formed up on house walls are load-bearing walls for added storeys and roof. New walls and roof are formed of light-weight construction materials. New walls and roof are faced internally with panels of light construction materials possessing thermal and sound insulating properties. Similar materials are used for making internal partitions and inter-storey floors. EFFECT: high efficiency. 7 cl
Title | Year | Author | Number |
---|---|---|---|
RECONSTRUCTED BUILDING AND METHOD FOR LOW-RISE BUILDING RECONSTRUCTION | 2015 |
|
RU2597901C1 |
DOMESTIC HOUSE OF THE FIRST MASS SERIES WITH ATTIC FLOOR OF VOLUMETRIC BLOCK-ROOMS, METHOD FOR ARRANGEMENT OF ATTIC FLOOR AND COMPLEX RECONSTRUCTION OF HOUSE | 1997 |
|
RU2140509C1 |
TECHNOLOGY OF CONSTRUCTION OF INDIVIDUAL HOUSES AND STRUCTURES | 2019 |
|
RU2717600C1 |
METHOD FOR MOBILE DEVELOPING HOUSE ERECTION | 2005 |
|
RU2296201C1 |
METHOD OF ERECTION OF MULTI-STOREY BUILDING WITH ENERGY-SAVING MULTILAYER WALLS | 2019 |
|
RU2732741C1 |
MULTI-LEVEL PARKING LOT OF MULTIPLE PURPOSE AND FACADE WALL FOR ITS ERECTION | 2008 |
|
RU2396403C2 |
MULTI-FUNCTIONAL STRUCTURE | 2012 |
|
RU2511067C1 |
METHOD FOR RECONSTRUCTION AND SUPERSTRUCTURE ERECTION ON BUILDINGS | 2011 |
|
RU2484219C2 |
RECONSTRUCTED BUILDING | 2012 |
|
RU2508433C1 |
METHOD OF RECONSTRUCTION OF BUILDINGS AND STRUCTURES | 2023 |
|
RU2820548C1 |
Authors
Dates
1997-06-20—Published
1994-12-06—Filed