FIELD: construction; applicable protective device at the entrances of underground structures with harmful and hazardous production processes, for instance, underground nuclear power stations. SUBSTANCE: earth-fill dam is installed in mine working and present a loose body confined from both sides by walls, and loose body is filled by hydraulic excavation with possibility of cementation in course of service, for instance, from sand. EFFECT: reduced labor input of erection and dismantling, easier operation, decreased permeability of dam. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROTECTIVE ARRANGEMENT OF SHAFT-TYPE UNDERGROUND STRUCTURES | 1995 |
|
RU2098561C1 |
TEMPORARY PROTECTIVE ROCK WEB | 2019 |
|
RU2726823C1 |
PROTECTION METHOD AGAINST AIR BLAST WAVE AND EXPLOSION PRODUCTS | 2009 |
|
RU2408788C1 |
TEMPORARY PROTECTIVE ROCK WALL | 2004 |
|
RU2249114C1 |
METHOD FOR PROTECTION FROM AIR-BLAST BY TEMPORARY ROCK WALL | 2003 |
|
RU2236598C1 |
METHOD OF ERECTING BRIDGE IN MINE WORKING | 0 |
|
SU977836A1 |
MINE CONNECTORS CONSTRUCTION METHOD | 2017 |
|
RU2677186C1 |
ENGINEERING CONSTRUCTION FOR FACILITIES OF UNDERGROUND ENERGY AND UNDERGROUND VERTICAL SECTIONS OF TRANSPORT SYSTEMS | 2014 |
|
RU2595255C2 |
RETAINING WALL | 1992 |
|
RU2081971C1 |
BOOM GUARD | 1994 |
|
RU2098547C1 |
Authors
Dates
1997-06-27—Published
1992-12-14—Filed