FIELD: formation of extensive soil openings. SUBSTANCE: drilling of rows of vertical deep-holes, placement of explosive charges in them, installation of live primers, stemming of deep-hole upper part, laying of blasting network and subsequent blasting. Length of deep-hole charges is determined by formula: L=1,1HC, m. Distance between deep-holes is determined by formula: , where H - design depth of opening, m; d - deep-hole diameter, m; γ - charge linear density (mass), kg/m; K - estimated specific consumption from charge center to open surface, m; C = 0,5+γ•Cexpl./Cdr. - dimensionless coefficient, depending on cost of drilling of 1 m of holes, Cexpl. (rouble/m) and of 1 kg of explosive in hole, Cdr. (rouble/kg). EFFECT: enhanced efficiency. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BLASTING NEAR GUARDED OBJECTS | 1998 |
|
RU2139490C1 |
METHOD OF DETERMINATION OF EXPLOSIVE RELATIVE ENERGY IMPARTED TO GROUND MASS AT BURST | 1996 |
|
RU2102697C1 |
METHOD FOR CONDUCTING OF DRILLING AND BLASTING OPERATIONS | 2001 |
|
RU2184928C1 |
GROUP DEEP-HOLE OUTBURST CHARGE | 1990 |
|
RU2026531C1 |
BLAST-HOLE (DEEP-HOLE) EXTENDED CHARGE AND METHOD OF DRILLING AND BLASTING | 1992 |
|
RU2066837C1 |
METHOD FOR DRILLING OF BLASTING OPERATIONS | 2004 |
|
RU2280237C1 |
METHOD FOR BLASTING OF ORES AND ROCKS | 2019 |
|
RU2709848C1 |
PROCESS OF THROWING DAM ACROSS CANYON BY BLAST | 1997 |
|
RU2122066C1 |
METHOD OF BLAST SEPARATION OF CONCRETE AND REINFORCED - CONCRETE BUILDING STRUCTURES AT THEIR DISMANTLING | 1994 |
|
RU2084815C1 |
METHOD FOR EXPLOSIVE DESTRUCTION OF FROZEN ROCK MASS | 2018 |
|
RU2678245C1 |
Authors
Dates
1997-06-27—Published
1995-04-26—Filed