FIELD: blasting operations in construction. SUBSTANCE: drilling of blast-holes in the planes of separation, placement of divided or extended explosive charges in them, tamping of stemming into part of the blast-holes at their entrance, wiring of the blasting network and subsequent blasting. The mass of the charges in the blast-hole depends on the dimensions of the slot and material strength and is calculated by formula: Q = 0,004B2•R1,4•H. The distance between the blast-holes and between the divided charges in blast-holes equals a= B, where Q - mass of charges, kg; B and M - design width and depth of the slot, respectively, m; R - compressive strength of concrete of building structures, MPa. EFFECT: facilitated procedure. 8 dwg
Title | Year | Author | Number |
---|---|---|---|
QUASAR-METHOD FOR DISMANTLING OF BUILDINGS, STRUCTURES AND BUILDING CONSTRUCTIONS | 1998 |
|
RU2151997C1 |
METHOD OF FORMATION OF EXTENSIVE SOIL OPENINGS BY EXCAVATING BLAST | 1995 |
|
RU2082948C1 |
METHOD OF DETERMINATION OF EXPLOSIVE RELATIVE ENERGY IMPARTED TO GROUND MASS AT BURST | 1996 |
|
RU2102697C1 |
METHOD FOR DESTRUCTION OF BUILDINGS | 2006 |
|
RU2301398C1 |
BLASTING METHOD OF DESTRUCTION OF IRREGULAR BLOCKS | 2015 |
|
RU2599809C1 |
EXTENDED CHARGE FOR DESTRUCTION OF ROCKS BY BLAST | 1994 |
|
RU2072091C1 |
SUSPENDED WELL STEMMING | 2019 |
|
RU2704694C1 |
METHOD FOR BLASTING NEAR GUARDED OBJECTS | 1998 |
|
RU2139490C1 |
METHOD OF FORMATION OF TRENCHES BY BLAST | 1988 |
|
RU2068170C1 |
METHOD FOR DESTRUCTION OF ROCKS | 1999 |
|
RU2143096C1 |
Authors
Dates
1997-07-20—Published
1994-04-20—Filed