FIELD: hydraulic power engineering. SUBSTANCE: this relates to installing additional hydroelectric generating sets at hydroelectric stations with full water storage. According to method, erected of local materials on back 7 of dam 2 is coffer-dam 8 and under protection of it water duct 4 is built through which water is delivered to hydroelectric generating sets of station building 1 installed behind dam 2. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTING A HYDRO-ELECTRIC INSTALLATION WITH CONCRETE DAM AND DAM-ADJOINING POWER STATION | 0 |
|
SU937600A1 |
HYDROSYSTEM | 1991 |
|
RU2057842C1 |
SHIPPING CHANNEL OF THE HYDROPOWER UNIT | 2021 |
|
RU2769468C1 |
COMPOSITE MOBILE DERIVATIONAL WATER CONDUIT AND METHOD OF ITS CONSTRUCTION | 2015 |
|
RU2607650C2 |
DAM-ADJOINING HYDRAULIC POWER STATION | 0 |
|
SU821645A1 |
WATER ENGINEERING SYSTEM ON PERMAFROST SOILS | 2010 |
|
RU2416692C1 |
DEVICE FOR THE COMPOSITE MOBILE DERIVATIVE WATER CONDUIT AND THE METHOD OF ITS ERECTION | 2016 |
|
RU2667080C2 |
HYDRAULIC ENGINEERING UNIT | 0 |
|
SU947268A1 |
GROUND DAM BUILT ON PERMAFROST BASE | 2006 |
|
RU2307891C1 |
METHOD OF CONSTRUCTING A HYDRAULIC POWER STATION | 0 |
|
SU1583511A1 |
Authors
Dates
1997-07-10—Published
1993-03-16—Filed