FIELD: arrangement of boilers and furnaces provided with air preheaters. SUBSTANCE: air preheater is located under boiler and economizer. EFFECT: reduced losses of heat into surrounding medium, increase of boiler plant efficiency by 1 to 1.5 percent with no increase in overall dimensions. 4 cl, 1 dwg