FIELD: hearing air positively fed to burner devices from blast fan. SUBSTANCE: air preheater includes metal tube panels secured in tube sheets and located after economizer and system of flow-through tubes located under boiler and economizer and immersed in layer of temperature-resistance heat-conducting material. At one end, flow-through tubes are connected to burners and at other end they are connected to stack of metal tubes through heated air collecting chamber. EFFECT: enhanced reliability. 13 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
GAS PREHEATER | 1994 |
|
RU2125205C1 |
BOILER PLANT | 1993 |
|
RU2083925C1 |
BOILER PLANT WITH A CYLINDRICAL BOILER AND A WATER-HEATER, A WATER-TUBE COUNTERCURRENT CYLINDRICAL BOILER WITH A CONVECTIVE BEAM, A RING-SHAPED SECTIONAL FINNED COLLECTOR | 2002 |
|
RU2249761C2 |
CYLINDRICAL HOT-WATER BOILER PLANT (VERSIONS) AND METAL CIRCULAR HEADER | 2000 |
|
RU2194213C2 |
BOILER PLANT | 1996 |
|
RU2124673C1 |
BOILER PLANT | 1998 |
|
RU2151948C1 |
HOT-WATER BOILER | 1995 |
|
RU2129243C1 |
ECONOMIZER | 1994 |
|
RU2101609C1 |
BOILER PLANT | 1995 |
|
RU2126930C1 |
BOILER PLANT | 1993 |
|
RU2056585C1 |
Authors
Dates
1997-08-10—Published
1994-04-18—Filed