FIELD: pump engineering. SUBSTANCE: hydrodynamic emitter is mounted to the pipe column under the packer at the perforation level. There is a passageway between the chamber of a jet pump and under- packer portion. Inside the passageway is a valve-relay. The hydrodynamic emitter is connected with the passageway through a filter-clutch and with the nozzle chamber. EFFECT: enhanced efficiency. 4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATING BOTTOM-HOLE ZONE OF BED | 1994 |
|
RU2128770C1 |
DOWNHOLE EQUIPMENT FOR POLYFREQUENCY WAVE TREATMENT OF BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION AND FLOWRATE OSCILLATIONS GENERATOR FOR THAT | 2014 |
|
RU2574651C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2078200C1 |
METHOD OF TREATMENT AND CLEANING OF WELLS AND BOTTOM-HOLE FORMATION ZONE | 1994 |
|
RU2111348C1 |
EQUIPMENT TO TREAT FACE ZONE OF POOL AND HYDRODYNAMIC GENERATOR OF FLOW RATE VARIATIONS FOR IT | 1997 |
|
RU2175718C2 |
OIL PRODUCTION METHOD WITH FORCE APPLICATION TO RESERVOIR AND DOWNHOLE EQUIPMENT FOR ABOVE METHOD REALIZATION | 2004 |
|
RU2285788C2 |
METHOD FOR TREATING DOWN-HOLE ZONE OF BED | 1994 |
|
RU2085721C1 |
BOREHOLE ASSEMBLY FOR BOTTOMHOLE FORMATION ZONE TREATMENT AND IMPULSIVE DEVICE FOR BOREHOLE ASSEMBLY | 2004 |
|
RU2274730C2 |
PROCESS OF ACTION ON FACE ZONE OF POOL AND GEAR FOR ITS IMPLEMENTATION | 1999 |
|
RU2175058C2 |
METHOD FOR EXTRACTING HYDROCARBON DEPOSITS INCLUDING COMPLEX PHYSICAL BED STIMULATION | 2004 |
|
RU2291954C2 |
Authors
Dates
1997-07-20—Published
1993-08-03—Filed