FIELD: industrial exploitation and restoration of productivity of wells under complicated conditions of development. SUBSTANCE: process of action on face zone of pool includes vibration-wave action and simultaneous periodic reduction of pressure on face below seam pressure. Vibration-depression action is implemented in turn on each perforation conduit or group of perforation conduits with local excitation of elastic vibrations right in them and with local reduction of pressure below seam pressure across inlet and inside perforation conduits. Gear for implementation of process includes lowered hollow body and cylindrical flow chambers hydraulically coupled to it. Each chamber is fitted with swirler of liquid flow, pressure nozzle, outlet toroidal chamber with outlet nozzle. EFFECT: increased efficiency of cleaning of face zones of pool. 9 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TREATMENT OF CRITICAL AREA OF FORMATION AND GEAR FOR ITS REALIZATION | 2001 |
|
RU2200832C2 |
DEVICE FOR WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1998 |
|
RU2153578C1 |
WELL PUMP UNIT | 1993 |
|
RU2084705C1 |
OIL PRODUCTION METHOD WITH FORCE APPLICATION TO RESERVOIR AND DOWNHOLE EQUIPMENT FOR ABOVE METHOD REALIZATION | 2004 |
|
RU2285788C2 |
TREATMENT METHOD OF PRODUCTIVE FORMATION, AND DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2010 |
|
RU2478778C2 |
METHOD OF TREATMENT AND CLEANING OF WELLS AND BOTTOM-HOLE FORMATION ZONE | 1994 |
|
RU2111348C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF BED | 1994 |
|
RU2085721C1 |
METHOD FOR EXTRACTING HYDROCARBON DEPOSITS INCLUDING COMPLEX PHYSICAL BED STIMULATION | 2004 |
|
RU2291954C2 |
METHOD OF PREPARING AND SUPPLYING HETEROGENEOUS MIXTURES TO FORMATION, AND PLANT FOR METHOD'S IMPLEMENTATION | 2008 |
|
RU2389869C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF BED | 1994 |
|
RU2128770C1 |
Authors
Dates
2001-10-20—Published
1999-03-22—Filed