FIELD: development of oil deposits with oil reserves difficult-to-recover. SUBSTANCE: in the method of simultaneous-separated injection of water and working agent, the latter is injected in form of stable gas-water foam. The foam is preliminarily produced at wellhead by ejection or bubbling when gas is supplied at low pressure, and water is supplied at high pressure. Foam is injected down to treated interval of perforation. Then, it is mixed with water by high pressure jet injector. produced mixture is injected into formation under the effect of elastic vibration for instance, with the aid of hydrodynamic generator. EFFECT: higher efficiency. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATING BOTTOM-HOLE ZONE OF BED | 1994 |
|
RU2128770C1 |
METHOD OF TREATMENT AND CLEANING OF WELLS AND BOTTOM-HOLE FORMATION ZONE | 1994 |
|
RU2111348C1 |
METHOD OF PREPARING AND SUPPLYING HETEROGENEOUS MIXTURES TO FORMATION, AND PLANT FOR METHOD'S IMPLEMENTATION | 2008 |
|
RU2389869C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF BED | 1994 |
|
RU2085721C1 |
METHOD OF DEVELOPMENT OF AN OIL POOL | 2002 |
|
RU2231631C1 |
WELL PUMP UNIT | 1993 |
|
RU2084705C1 |
METHOD FOR EXTRACTING HYDROCARBON DEPOSITS INCLUDING COMPLEX PHYSICAL BED STIMULATION | 2004 |
|
RU2291954C2 |
DOWNHOLE EQUIPMENT FOR POLYFREQUENCY WAVE TREATMENT OF BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION AND FLOWRATE OSCILLATIONS GENERATOR FOR THAT | 2014 |
|
RU2574651C1 |
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
TREATMENT METHOD OF PRODUCTIVE FORMATION, AND DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2010 |
|
RU2478778C2 |
Authors
Dates
1997-04-27—Published
1994-03-04—Filed