FIELD: oil and gas production industry. SUBSTANCE: this relates to construction of oil, gas and other wells drilled in zones of plastic rocks in conditions of abnormally high external pressure. Well drilled in interval of plastic rock deposition is provided with system of concentric casing strings with strengthening rings installed on outer surface of tubes. Distance between neighboring side faces of rings is determined by formula: , where R - average radius of casing tube, m; σy - yield point of casing tube material, MPa; h - equivalent thickness of casing tube sector subjected to contact rock pressure, m, determined by formula: h=Ro-0,866Ri, where Ro - outer radius of casing tube, m; Ri - inner radius of casing tube, m; Rc - contact pressure of plastic rock, MPa. Axes of strengthening rings on tubes of subsequent casing string are displaced relative to side faces of neighboring rings on tube of preceding casing string to half of design distance. Overall dimensions of rings are equal to overall dimensions of sleeve joints of casing strings. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL DRILLING IN HIGH-PERMEABILITY INCOMPETENT GAS-CONTAINING FORMATIONS | 1996 |
|
RU2121558C1 |
METHOD OF BOREHOLE CONSOLIDATION IN PLASTIC BOCK | 0 |
|
SU1731938A1 |
METHOD FOR OPENING OF PRODUCTIVE GAS-BEARING BED BY DRILLING | 1998 |
|
RU2148698C1 |
METHOD FOR SHUTOFF OF WATER INFLOW OF BOTTOM WATER IN GAS WELLS UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 1996 |
|
RU2121569C1 |
METHOD OF WELLBORE CLEANING | 1999 |
|
RU2168000C2 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
VISCOELASTIC COMPOSITION FOR INSULATING OPERATIONS IN WELLS | 2008 |
|
RU2356929C1 |
METHOD OF BOREHOLE FIXING | 1993 |
|
RU2057904C1 |
METHOD OF PRODUCING GAS-BEARING FORMATION DRILLING-IN | 2000 |
|
RU2196869C2 |
CASING CENTRALIZER | 1990 |
|
RU2014427C1 |
Authors
Dates
1997-07-27—Published
1995-02-07—Filed