FIELD: oil production industry. SUBSTANCE: according to method, run into well by rope or scraper wire down to depth below lower level of ground freezing depth is turbine-type flow rate sensor with converter of rotation speed into code-pulse signals corresponding to flow rate. Coded signals are recorded in electronic memory according to program preset by timer. Electronic memory and timer are accommodated in subsurface flow rate sensor. Recorded code-pulse signals are decoded and processed with the help of computer after lifting flow rate sensor out of well. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MEASURING OUTPUT OF PRODUCING WELLS | 1994 |
|
RU2085731C1 |
METHOD FOR DETERMINING PARAMETERS OF WELL PRODUCT | 2006 |
|
RU2304715C1 |
METHOD OF INFLUENCE ON STAGNANT ZONE OF INTERVALS OF STRATA OF GARIPOV AND PLANT FOR ITS IMPLEMENTATION | 2012 |
|
RU2529072C2 |
INFORMATION SUPPORT SYSTEM FOR OIL FIELD DEVELOPMENT | 1993 |
|
RU2077735C1 |
METHOD OF OPERATING WELLS RESEARCH | 1999 |
|
RU2167287C2 |
METHOD OF DETERMINATION OF FLOW STRING LEAKING IN INJECTION WELL EQUIPPED WITH TUBING | 2001 |
|
RU2211327C2 |
METHOD OF RESEARCH OF RUNNING WELLS AND DEVICE FOR ITS EMBODIMENT | 1999 |
|
RU2172826C2 |
METHOD FOR CREATION OF GRAVEL FILTER IN WELL | 1999 |
|
RU2146759C1 |
INSTALLATION NAMED AFTER GARIPOV FOR OIL PRODUCTION WITH DUAL DISPOSAL OF BRINE WATER AND METHOD OF ITS IMPLEMENTATION (VERSIONS) | 2012 |
|
RU2534688C2 |
INJECTION WELL | 2015 |
|
RU2574641C2 |
Authors
Dates
1997-07-27—Published
1994-06-06—Filed