FIELD: oil-gas producing industry, particularly, monitoring of oil and gas deposit development, more specifically, determination of leaking of flow string in injection well equipped with tubing. SUBSTANCE: method includes registration of flow rate of fluid injected into well by flowmeter lowered below tubing funnel. Registration of flow rate of injected fluid is carried out at wellhead as well by flowmeter of same design as of that lowered into well. Flowmeter is installed on pipe length in pressure line located in interval between pumping unit and wellhead. Leaking of flow string is detected by discrepancy of flow rates of injected water registered by flowmeters. Flowmeters are used in form of electromagnetic flowmeters. Diameter of pipe length is selected equal to diameter of flow string. Fluid for injection into well is conducting one. EFFECT: higher efficiency due to confident information on well casing string leaking. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETECTION OF FAULTY SEALING OF FLOW STRING PROVIDED WITH TUBING PIPES | 2001 |
|
RU2209962C2 |
PRESSURE-TESTING METHOD FOR WELL PROVIDED WITH FLOW STRING | 2006 |
|
RU2310062C1 |
METHOD OF DETECTING CROSS-FLOWS IN WELL | 2008 |
|
RU2361079C1 |
METHOD OF WELL OPERATION | 2007 |
|
RU2335624C1 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
METHOD FOR PRESSURE TEST OF TUBING STRING | 2011 |
|
RU2455479C1 |
METHOD FOR DETERMINING TUBING TIGHTNESS IN INJECTION WELLS | 2018 |
|
RU2693090C1 |
METHOD OF WELL INVESTIGATION | 2009 |
|
RU2384698C1 |
METHOD FOR CONTROLLING PRESSURIZATION OF FORCE WELL | 2004 |
|
RU2246613C1 |
PREPARATION SYSTEM OF THE FLOW COLUMN TO THE PROCESS STEPS OF FORMATION STIMULATION, METHOD OF PREPARATION AND METHOD OF FORMATION STIMULATION | 2016 |
|
RU2618537C1 |
Authors
Dates
2003-08-27—Published
2001-09-03—Filed