FIELD: oil and gas producing industry; applicable in cementing of casing strings. SUBSTANCE: the offered device includes body with packer units at its ends, drive of packer opening and channels for passage of drilling mud made in form of longitudinal pipes adjacent to body. Made between pipes are perforations closed with acid-soluble plugs. Total sectional area of pipes amounts to, at least, 20% of sectional areas of annular space between well walls and casing string. EFFECT: exclusion of crossflows between water-bearing and oil formations and reduced specific metal content. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
MUD GROUTING DEVICE | 1996 |
|
RU2107802C1 |
DEVICE FOR INVESTIGATION AND OPERATION OF WELL DRILLED INTO RESERVOIR MADE UP OF TWO INTERLAYERS | 1994 |
|
RU2084625C1 |
METHOD FOR CEMENTING FLOW STRING IN WELL | 0 |
|
SU1798483A1 |
METHOD FOR PUMPING IN HORIZONTAL WELLS | 1992 |
|
RU2061838C1 |
PUMPING UNIT FOR HANDLING GAS-WATER-OIL MIXTURE | 1996 |
|
RU2105202C1 |
AQUEOUS BASE MUD | 1996 |
|
RU2123023C1 |
DEVICE FOR COMPLETION OF WELLS | 1995 |
|
RU2095545C1 |
METHOD FOR PUMPING IN WELL | 1992 |
|
RU2068943C1 |
DEVICE FOR STOPPING FLUID FLOW IN THE WELL | 2003 |
|
RU2237152C1 |
Authors
Dates
1997-09-27—Published
1994-04-18—Filed