FIELD: oil and gas production. SUBSTANCE: well bottom zone is affected by pulse electric current after preliminarily determined reversibility of alterations in formation mass permeability and critical current density from corresponding formula. Depending on requirements related to permeability alteration regarding increase or decrease thereof and also reversibility of alteration, current density, pulse duration, and on-off time ratio of pulse are chosen. EFFECT: intensified treatment process. 5 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INCREASE OF PERMEABILITY OF OIL-BEARING FORMATION BOTTOMHOLE ZONE | 2002 |
|
RU2208146C1 |
METHOD OF PREPARING WELL TO PRODUCTION | 0 |
|
SU1273514A1 |
PROCEDURE FOR INCREASE OF PERMEABILITY OF BOTTOMHOLE ZONE OF OIL-BEARING BED | 2010 |
|
RU2426869C1 |
METHOD FOR STIMULATION OF WATER YIELD OF WATER-BEARING HORIZONS VIA PRODUCTION WELLS | 2007 |
|
RU2344275C1 |
HYDROCARBON PRODUCTION STIMULATION DEVICE | 2003 |
|
RU2267008C2 |
METHOD AND DEVICE FOR HYDROCARBON RECOVERY STIMULATION | 2003 |
|
RU2267007C2 |
METHOD OF PREPARING DEPOSITS TO UNDERGROUND LEACHING | 0 |
|
SU1404642A1 |
METHOD FOR ACTION AT WELL BOTTOM ZONE AND OIL-SATURATED BEDS (VERSIONS) AND DEVICE FOR ITS REALISATION | 2008 |
|
RU2373386C1 |
METHOD FOR CONTROL OF FILTERING PROPERTY OF COLLECTING ROCK | 1992 |
|
RU2047758C1 |
METHOD FOR ACTION AT WELL BOTTOM ZONE AT DEVELOPMENT STAGE (VERSIONS) AND DEVICE FOR ITS REALISATION | 2008 |
|
RU2373387C1 |
Authors
Dates
1997-09-10—Published
1990-12-26—Filed