FIELD: geotechnology. SUBSTANCE: the offered method includes formation of pile of complex ores on impervious base, and electrodes are placed into pile. First, potential difference is applied to electrodes and water is supplied through pipeline. After electrochemical dissolving of elements-impurities, useful components is leached. For this purpose, voltage is removed, and supplied through pipelines are solutions containing active agents. Metal-carrying solutions are collected in solution collectors. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ELECTROCHEMICAL ORE HEAP LEACHING | 1994 |
|
RU2062869C1 |
METHOD FOR LIXIVIATION OF METALS FROM HARD-TO-PENETRATE ORES WITH HIGH CONTENT OF CLAY | 1995 |
|
RU2083814C1 |
METHOD FOR EXTRACTION OF METALS OF SLIGHTLY PERMEABLE CLAY ORES | 1995 |
|
RU2094500C1 |
METHOD FOR ELECTROCHEMICAL LIXIVIATION OF ORES | 1994 |
|
RU2108453C1 |
METHOD FOR ELECTROCHEMICAL HEAP LEACHING OF METALS | 1995 |
|
RU2087696C1 |
METHOD OF HEAP LEACHING OF METALS AT SUBZERO AMBIENT TEMPERATURE | 1995 |
|
RU2091573C1 |
PROCESS OF ACCUMULATED LEACHING OF METALS AT NEGATIVE AMBIENT TEMPERATURES | 1993 |
|
RU2057920C1 |
METHOD FOR SELECTIVE INTRADUMP CONCENTRATION OF METAL-CONTAINING ROCKS | 1992 |
|
RU2042818C1 |
METHOD FOR HEAP ELECTROCHEMICAL LIXIVIATION OF ORES | 1996 |
|
RU2110681C1 |
METHOD FOR STORING AND LEACHING OF TAILINGS | 1990 |
|
RU2053349C1 |
Authors
Dates
1997-09-27—Published
1993-07-23—Filed