FIELD: gas production industry. SUBSTANCE: increased output of product from hydrocarbon reservoir is achieved as follows. After putting deposit in operation, hydrocarbon mixture is taken from productive reservoir at exhausting mode of operation up to pressure of maximal condensation of ethane-propane-butane fraction (C2- C4) of reservoir mixture. Then injection is effected of dry hydrocarbon gas for partial maintaining of reservoir pressure. At content of C2- C4 fraction being less than double content of stable condensate (C5+), created in reservoir prior to injecting hydrocarbon gas is fringe at volume of at least 15% of volume of pores in acting zone from hydrocarbon gas saturated with fraction C2- C4 at current reservoir pressures and temperature. EFFECT: high efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROGNOSTICATION OF CONDENSATE CONTENT IN FORMATION GAS AND ITS CUMULATIVE RECOVERY FOR POOLS WITH HIGH CONTENT OF CONDENSATE | 1998 |
|
RU2143065C1 |
METHOD OF EXTRACTION OF STABLE CONDENSATE FROM NATURAL GAS | 1995 |
|
RU2096701C1 |
METHOD OF CONTROL OVER DEVELOPMENT OF GAS-CONDENSATE DEPOSIT WITH INJECTION OF GASEOUS AGENT | 1995 |
|
RU2144983C1 |
METHOD OF RECOVERY OF STABLE CONDENSATE FROM NATURAL GAS | 1998 |
|
RU2171270C2 |
METHOD OF DEVELOPING GAS-CONDENSATE FIELD WITH UNDERLYING OIL FRINGE | 0 |
|
SU1629504A1 |
METHOD FOR PREPARING GAS-CONDENSATE MIXTURE TO TRANSPORTATION | 1996 |
|
RU2092690C1 |
METHOD OF TREATING GAS-CONDENSATE MIXTURE FOR TRANSPORTATION | 1997 |
|
RU2124389C1 |
METHOD OF PREPARATION OF UNSTABLE HYDROCARBON CONDENSATE FOR PIPE LINE TRANSPORTATION IN SINGLE-PHASE STATE | 1995 |
|
RU2124682C1 |
METHOD FOR PREDICTING CHANGE OF FRACTION COMPOSITION OF BED GAS CONDENSATE IN PROCESS OF GAS-CONDENSATE DEPOSIT EXTRACTION | 2003 |
|
RU2255217C2 |
METHOD OF EXCAVATING GAS-CONDENSATE FIELD | 0 |
|
SU634596A1 |
Authors
Dates
1997-10-10—Published
1996-03-15—Filed