FIELD: gas producing industry. SUBSTANCE: prior to injection of gaseous agent into formation, content of in products of producing wells is determined. If values of for different wells differ from one another by values exceeding the permissible ones, for control use is made of concrete value of $ for each well separately. If these values vary for different wells within value of error of determination, use is made of one weighted mean for entire group of producing wells. After start of injection of gaseous agent into formation, value of content of nitrogen in injected agent is determined at a preset frequency, 1-2 times a month, which shall approximately by order of magnitude lower than that in formation mixture and in products of producing wells. Determined for each producing well, by results of each analysis, with estimation of nitrogen content in products, is fraction of gaseous agent with the help of the given formula. EFFECT: higher accuracy of determination of moment of breakthrough of injected agent and determination of its fraction in products of producing well of gas-condensate deposit. 1 dwg, 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF GAS-CONDENSATE DEPOSIT | 1996 |
|
RU2092680C1 |
METHOD OF PROGNOSTICATION OF CONDENSATE CONTENT IN FORMATION GAS AND ITS CUMULATIVE RECOVERY FOR POOLS WITH HIGH CONTENT OF CONDENSATE | 1998 |
|
RU2143065C1 |
METHOD FOR HYDRAULIC BREAKAGE OF STRATUM | 1993 |
|
RU2071557C1 |
METHOD FOR DETERMINING AMOUNT OF BRINE WATER PENETRATED INTO GAS-CONDENSATE OR OIL DEPOSIT DURING ITS DEVELOPMENT | 1996 |
|
RU2110674C1 |
METHOD FOR INCREASE OF CONDENSATE RECOVERY IN DEVELOPMENT OF GAS-CONDENSATE POOL | 1992 |
|
RU2043485C1 |
METHOD FOR DETERMINATION OF FILTRATION DIRECTION OF EXTERNAL GASEOUS AGENT IN GAS CONDENSATE DEPOSIT | 2009 |
|
RU2411358C1 |
METHOD FOR OPERATIONAL CONTROL OF GAS-LIFT WELL | 1997 |
|
RU2133331C1 |
METHOD FOR DEVELOPMENT OF GAS-CONDENSATE FIELD IN ACTIVE WATER- BEARING FORMATION | 1991 |
|
RU2023141C1 |
METHOD OF EXCAVATING GAS-CONDENSATE FIELD | 0 |
|
SU634596A1 |
METHOD FOR CONTROL OF FLOODING IN GAS AND GAS-CONDENSATE DEPOSITS | 1996 |
|
RU2125150C1 |
Authors
Dates
2000-01-27—Published
1995-06-01—Filed