FIELD: oil production industry. SUBSTANCE: according to method, injection well is stopped and held closed until restoration of reservoir pressure in down-hole zone of well. Then pumped into injection well is material which levels profile of injectivity, water if pressure-forced and isolation composition is injected. Used as material for levelling profile of injectivity is oil emulsion in amount of 10-25 cu.m per 1 m of productive interval. Used as water for pressure-forcing is brine. After pressure-forcing with brine, technological delay is initiated during 1 - 2 days. Isolating composition is injected in amount of 5-10 cu.m per 1 m of productive interval under pressure which is 30-40% higher than oil emulsion injection pressure. Technological delay is kept during 1-2 days. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATING BOTTOM-HOLE ZONE OF INJECTION WELL | 1995 |
|
RU2084621C1 |
METHOD FOR TREATMENT OF WATERED DOWN-HOLE ZONE OF PRODUCING WELL | 1996 |
|
RU2094603C1 |
METHOD FOR DEVELOPMENT OF OIL POOL | 1995 |
|
RU2084617C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2094601C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF OIL BED | 1996 |
|
RU2095559C1 |
METHOD FOR LEVELLING INJECTIVITY PROFILE WITH SIMULTANEOUS BACTERICIDAL TREATMENT | 1998 |
|
RU2142048C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL IN MULTIPLE-BED OIL DEPOSIT | 1996 |
|
RU2092686C1 |
METHOD OF INSULATING ABSORPTION ZONES IN INJECTION WELLS | 1994 |
|
RU2089716C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT WITH HIGH-TEMPERATURE BED | 1996 |
|
RU2094599C1 |
METHOD OF BOTTOMHOLE ZONE TREATMENT | 2002 |
|
RU2208150C1 |
Authors
Dates
1997-10-27—Published
1996-07-05—Filed