METHOD FOR COMPLETION OF WELLS Russian patent published in 1997 - IPC

Abstract RU 2094595 C1

FIELD: oil and gas production industry. SUBSTANCE: this is used in construction of gas-condensate and oil wells. Method reduces fouling of reservoir being opened, cuts construction period and consumption of chemical reagents, clay, weighting material, water, heat, energy. According to method, string of pump-compressor pipes is lowered into cemented producing string filled with forcing-through liquid. Well-head flow equipment is installed and connected with manifold. Well head is hermetically sealed. Forcing-through liquid is replaced with water. Lubricator is installed on buffer of flow equipment. Well head is pressure tested by delivering compressed air from compressor into annular space. Then compressed air is additionally compressed by water which is injected into tubular passage by means of pumping unit. After pressure-testing of well head, lubricator is subjected to pressure testing. For this purpose inner space of lubricator is connected to tubular passage. On completion of lubricator pressure-testing, tubular passage is closed. Then compressed air from annular space is directed into tubular passage through manifold of flow equipment. Surplus pressure of compressed air is reduced by releasing air to atmosphere. After that, tubular passage and annular space are isolated from each other. Perforators are lowered into producing string through lubricator and pump-compressor pipe string. Producing string is perforated and perforators are lifted to well head. Operation of well is started from gradual reduction of surplus pressure in annular space by connecting to atmosphere. Then annular space is closed and started is smooth reduction of surplus pressure in tubular passage by opening it to atmosphere. Upon above procedure, well is air blown through tubular passage for complete cleaning of bottom-hole zone. Then investigation of well is initiated. EFFECT: high efficiency. 3 cl

Similar patents RU2094595C1

Title Year Author Number
PIPE HEAD 2000
  • Tugushev R.Sh.
  • Barantsevich Stanislav Vladimirovich
  • Kejbal A.V.
RU2170328C1
TUBING HEAD 2001
  • Tugushev R.Sh.
  • Barantsevich Stanislav Vladimirovich
  • Kejbal A.V.
RU2182218C1
METHOD AND DEVICE FOR STRENGTHENING BOTTOM-HOLE ZONE OF GAS WELLS 1995
  • Tugushev Rasim Shakhimardanovich
  • Kejbal Aleksandr Viktorovich
RU2081296C1
DEVICE FOR CEMENTATION OF CASING STRING IN WELL 1996
  • Tugushev Rasim Shakhimardanovich
  • Barantsevich Stanislav Vladimirovich
  • Kejbal Aleksandr Viktorovich
RU2101465C1
UNDERGROUND EQUIPMENT FOR OPERATING WELLS 1996
  • Tugushev Rasim Shakhimardanovich[Ru]
  • Barantsevich Stanislav Vladimirovich[Ua]
  • Kejbal Aleksandr Viktorovich[Ru]
RU2081999C1
TOOL FOR EXPANSION OF SHAFT OF HOLE 2000
  • Tugushev R.Sh.
  • Zaripov R.K.
  • Barantsevich Stanislav Vladimirovich
  • Kejbal A.V.
  • Oksenojt G.K.
RU2170319C1
TUBULAR HEAD 1997
  • Tugushev R.Sh.(Ru)
  • Vjakhirev V.I.(Ru)
  • Barantsevich Stanislav Vladimirovich
  • Kejbal A.V.(Ru)
RU2117749C1
ARRANGEMENT OF LOWER PART OF DRILL PIPE STRING FOR EXPANSION OF SHAFT OF HOLE 2000
  • Tugushev R.Sh.
  • Zaripov R.K.
  • Barantsevich Stanislav Vladimirovich
  • Kejbal A.V.
  • Oksenojt G.K.
RU2170318C1
WELL BLOWOUT PREVENTER 1996
  • Tugushev Rasim Shakhimardanovich[Ru]
  • Barantsevich Stanislav Vladimirovich[Ua]
  • Kejbal Aleksandr Viktorovich[Ru]
RU2100570C1
UNDERGROUND EQUIPMENT FOR OPERATION OF WELLS 1995
  • Tugushev Rasim Shakhimardanovich
  • Kejbal Aleksandr Viktorovich
RU2081303C1

RU 2 094 595 C1

Authors

Ioannesjan Garri Rolenovich[Ru]

Tugushev Rasim Shakhimardanovich[Ru]

Barantsevich Stanislav Vladimirovich[Ua]

Kejbal Aleksandr Viktorovich[Ru]

Dates

1997-10-27Published

1996-02-16Filed