FIELD: burning fuel in boilers provided with furnaces with circulating fluidized layer. SUBSTANCE: boiler has furnace 1 with circulating fluidized layer with dense fluidized dense fluidized layer 2 in its lower portion, high-temperature cyclone 3, by pass gas duct 4 and convective gas duct 5, fuel hopper 6, chutes 7 and 8 to return flue dust and supply fuel, primary cold air pipeline 9 and secondary hot air pipeline 10. Ports 11 for supply of flue dust to furnace are made at boundary of dense fluidized layer 2 and ports 12 for supply of fuel into furnace are made above this boundary. Fuel supply chutes 8 and connected with secondary air supply pipeline 10 by means of pipelines 13 with adjustable air flow rate sensors 14 connected with pressure sensors 15 mounted in ports 12. EFFECT: enhanced reliability. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
BOILER WITH FLUIDIZED BED AND SOLID PARTICLE SEPARATOR | 1992 |
|
RU2044955C1 |
METHOD OF BURNING SOLID FUEL AND FURNACE FOR ITS REALIZATION | 1990 |
|
RU2027102C1 |
0 |
|
SU1781509A1 | |
CIRCULATING FLUIDIZED-BED BOILER | 0 |
|
SU1746129A1 |
VORTEX AFTERBURNING BOILER | 2020 |
|
RU2748363C1 |
DOUBLE-STAGE FURNACE OF BOILER | 1995 |
|
RU2132513C1 |
SWIRLING-TYPE FURNACE | 2005 |
|
RU2298132C1 |
STOKER-FIRED BOILER | 0 |
|
SU1755008A1 |
BOILER | 2000 |
|
RU2191324C2 |
BOILER WITH CIRCULATING LAYER | 2012 |
|
RU2514575C1 |
Authors
Dates
1997-10-27—Published
1993-05-31—Filed