FIELD: construction, erection of arches of lightened arch buildings. SUBSTANCE: arches are mounted on a foundation and their flanged ends are fastened to the anchor member installed at an angle to the foundation towards the span increase; final tightening of the bolts inserted in the oval holes of the flanges is carried out after erection of the arches and guard structures. Supports are installed on the anchor members of both arch abutments, with the distance from the support to the anchor bolt being equal to the sum of the design size of the distance from the bolt to the flange edge and half the length of the flange oval hole. EFFECT: enhanced quality of erection of arch buildings due to enhanced precision of installation of arches for the preset span, enhanced bearing capacity of arches against arising overstrain because of the shift of the arch ends under gravity. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
ARCHED BUILDING | 1995 |
|
RU2105105C1 |
ARCH COVERING | 2000 |
|
RU2209275C2 |
FIXTURE TO REINFORCE STONE STRUCTURE | 1998 |
|
RU2150557C1 |
PROCESS OF REINFORCEMENT OF STONE STRUCTURES OF BUILDING | 2000 |
|
RU2196868C2 |
METHOD FOR STRENGTHENING OF SUPPORTING UNIT IN SPAN STRUCTURES | 1996 |
|
RU2132432C1 |
COVERING OF BUILDING | 2001 |
|
RU2199636C2 |
DEVICE FOR REINFORCEMENT OF SUPPORTING ASSEMBLY OF BAY CONSTRUCTIONS | 1996 |
|
RU2140510C1 |
SUPPORTING UNIT OF THREE-CORE PANEL | 2001 |
|
RU2191872C2 |
ARCH MEMBER JOINT CONNECTION | 2004 |
|
RU2273702C1 |
DEVICE FOR REINFORCEMENT OF SUPPORTING ASSEMBLY OF GIRDER CONSTRUCTION | 1996 |
|
RU2140511C1 |
Authors
Dates
1997-12-20—Published
1994-10-27—Filed