FIELD: mining. SUBSTANCE: the offered method includes preparation of mine field by sinking shafts, driving of fringe drifts, intermediate crosscuts, holdings. Seams are stopped by single-side extraction fields on the mass of mine wing in direction of return gas-air current in mine field wing, stoping operations in extraction field relative to opening and sequence of mining of mine wing with simultaneous crosscut pillar stoping. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING AND MINING A SUIT OF STEEP GAS-BEARING AND OUTBURST-HAZARDOUS SEAMS | 0 |
|
SU1242615A1 |
METHOD OF CONTROLLING GAS EMISSION IN MINING A GROUP OF ADJOINING BEDS | 0 |
|
SU1379463A1 |
METHOD OF WORKING GASSY FIRE-HAZARDOUS SEAMS IN LONG PILLARS WITH ROOF CAVING | 0 |
|
SU1599540A1 |
METHOD OF PREPARING A GROUP OF STEEP EXPLOSION-HAZARDOUS SEAMS FOR MINING AT GREAT DEPTHS | 0 |
|
SU1280131A1 |
0 |
|
SU1566024A1 | |
METHOD OF WORKING THIN GENTLY-SLOPING GAS-LADEN GAS-HAZARDOUS COAL BEDS | 0 |
|
SU1016515A1 |
METHOD OF UNDER-LEVEL PLASTS' DEVELOPMENT PROCESSING WITH THE BINDING OF THE ESTABLISHED SPACE | 2017 |
|
RU2644185C1 |
METHOD FOR GAS-LADEN FLAT-LAYING COAL SEAM MINING | 2005 |
|
RU2301892C1 |
METHOD FOR PREPARATION OF GENTLY DIPPING COAL SEAMS FOR MINING | 1991 |
|
RU2021510C1 |
METHOD OF BEDDED DEPOSIT DEVELOPMENT | 2006 |
|
RU2343284C2 |
Authors
Dates
1998-01-10—Published
1995-05-12—Filed