FIELD: breaking of broken-up rocks of any types. SUBSTANCE: the method consists in drilling-up of rows of well blastholes in area of the rock mass to be broken in a strictly definite order: the distance between the rows of blast-holes (wells) should be equal to W (not more); the distance between the blast-holes (wells) in rows should be equal to rr (not more), and their breaking in turn, producing the design contour of the broken-up mass. The values of W and rr are determined depending on the strength characteristics of the broken-up mass and powder of the explosive used. EFFECT: enhanced efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BREAKAGE OF CRYSTAL-CONTAINING ROCKS BY EXTENDED CHARGES | 1998 |
|
RU2142610C1 |
METHOD OF FORMATION OF CUTTING CAVITY | 1992 |
|
RU2081392C1 |
METHOD OF BLASTING OF CRUMBLING ROCKS ONTO OPEN SURFACE | 1997 |
|
RU2133447C1 |
METHOD TO OUTLINE MINES AND PILLARS IN CASE OF ROCK MASSIF BLASTING | 2011 |
|
RU2472105C1 |
METHOD FOR LARGE-SCALE EXPLOSIVE DESTRUCTION OF MINE ROCK MASSES OF COMPLEX STRUCTURE FOR SELECTIVE EXTRACTION OF MINERAL DEPOSIT AT OPEN-PIT MINING | 2012 |
|
RU2511330C2 |
PROCESS OF DESTRUCTION OF ROCKS WITH DRIVING OF WORKING IN THEM | 1992 |
|
RU2006581C1 |
METHOD FOR DEVELOPING MINE WORKINGS AND CONDUCTING STOPING OPERATIONS | 2016 |
|
RU2634597C1 |
METHOD OF UNDERGROUND DEVELOPMENT OF THIN VEINS | 2010 |
|
RU2418167C1 |
METHOD FOR FORMATION OF CHARGE IN WELL COMBINED OPEN-UNDERGROUND MINING | 2019 |
|
RU2725721C1 |
METHOD OF BLASTING ROCK | 2015 |
|
RU2584167C1 |
Authors
Dates
1998-01-10—Published
1995-04-14—Filed