FIELD: construction. SUBSTANCE: method for installation of piles into permafrost grounds includes filling of hole with loose ground to the height determined by the given relation. Then, installed in the hole is flat-profiled stem of pile which is forced into filled ground under the action of own gravity. Pockets are filled with same ground and pile is finally forced down to designed depth. EFFECT: higher ground bearing capacity, reduced material consumption and labor input and decreased terms of construction due to elimination of technological break between the time of pile installation and its loading. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INSTALLATION OF PILE IN OVERFROZEN GROUND | 1991 |
|
RU2045625C1 |
PRECAST PILE | 1991 |
|
RU2024682C1 |
METHOD FOR ENHANCING PILES FOUNDATIONS | 0 |
|
SU1645369A1 |
INSTALLATION METHOD FOR A DRIVING PILE IN A PERFORATED MANTLE PIPE | 2019 |
|
RU2713822C1 |
METHOD FOR CONSOLIDATION OF PILE FOUNDATION OF SUPPORTS FOR ELECTRIC POWER LINES | 1996 |
|
RU2117101C1 |
DRIVE PILE DEVICE IN PUNCHED WELL WITH WIDER BASE | 2014 |
|
RU2582530C2 |
METHOD OF PILE DRIVE DEVICE | 2014 |
|
RU2601630C2 |
DRIVING METHOD OF DRIVEN HOLLOW PILE WITH A WIDENED BASE | 2018 |
|
RU2685719C1 |
METHOD OF ARRANGING DRIVEN PILE | 2017 |
|
RU2640467C1 |
METHOD OF ARRANGEMENT OF DRIVEN PILE IN A WELL WITH AN EXTENDED BASE | 2018 |
|
RU2678172C1 |
Authors
Dates
1996-06-10—Published
1990-07-18—Filed