FIELD: mining industry. SUBSTANCE: this can be used in opencast development of watered mineral deposits. According to method following procedure is adopted: deposit is exposed, overburden and mineral are mined in benches, pillars are formed, overburden ground mass is dumped into worked-out space behind pillar, mineral is extracted and loaded out. Lower working bench of mineral is developed in sub-benches. Mineral material from upper sub-bench is extracted and placed on upper working area into dewatering pile. Formed from lower sub-bench is subwater pile at bench slope, it is worked, and mineral is placed into dewatering pile. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WATERED MINERAL DEPOSITS DEVELOPMENT | 2020 |
|
RU2750445C1 |
METHOD FOR PERFORMING MINING OPERATIONS UNDER LAKE | 2004 |
|
RU2257473C1 |
METHOD FOR REMOVAL OF HARD ROCK OVERBURDEN | 1989 |
|
RU2012807C1 |
METHOD FOR OPEN-PIT EXPLOITATION OF HORIZONTAL AND SLOPE BLANKET DEPOSITS OF MINERALS | 1993 |
|
RU2065050C1 |
METHOD OF MINING BENCHES | 0 |
|
SU1638306A1 |
METHOD FOR OPENCAST MINING IN UNFAVORABLE GEOLOGICAL CONDITIONS | 0 |
|
SU1799420A3 |
METHOD OF OPENCAST MINING OF DEPOSIT OF MINERAL RESOURCES | 0 |
|
SU1794191A3 |
METHOD FOR MINING FLOODED BENCH | 0 |
|
SU1789702A1 |
METHOD FOR HANDLING OVERBURDEN EARTH | 1995 |
|
RU2106494C1 |
METHOD OF DEVELOPING BEDDED DEPOSITS WITH DRAG-LINES | 2015 |
|
RU2584334C1 |
Authors
Dates
1998-01-20—Published
1993-03-17—Filed