FIELD: construction engineering. SUBSTANCE: method for installing unit of sectional structure of arched or other geometrical configuration implies assembly of section from panels with their fastening and fixing, heat insulation of joints, connection with mounting devices, setting sections in working position and connection with previously installed section or end-face wall. To simplify and accelerate mounting, reduce internal stresses in framework of section (panel) caused by dynamic and static loads in installing section in working position, assembly of section is performed at vertical position of longitudinal horizontal axis of section with connection of corners of extreme panels with mounting hinges, and upper corners with links of lifting device by means of which section is gradually turned through 90 deg. until it is installed on foundation socle with subsequent connection with earlier installed section, with sealing of joint and mounting of end-face wall, at no external work on surface of arch. EFFECT: high efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSTALL SECTIONAL VAULTED CONSTRUCTION | 1991 |
|
RU2037607C1 |
SECTIONAL STRUCTURE | 1998 |
|
RU2143532C1 |
UNIFIED BRIDGE COMPLEX | 2001 |
|
RU2212488C2 |
METHOD TO ERECT TRANSFORMABLE BUILDING OF CULTURAL AND LEISURE INSTITUTION | 2013 |
|
RU2527444C1 |
BUILT-UP STRUCTURE | 1992 |
|
RU2035554C1 |
PANEL BLOCK ASSEMBLING DEVICE | 2003 |
|
RU2252304C2 |
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
FOLDABLE SECTION OF PREFABRICATED KNOCK-DOWN BUILDING | 0 |
|
SU1448004A1 |
METHOD OF ERECTION OF SHELLS ON PNEUMATIC FALSEWORK | 1994 |
|
RU2112120C1 |
UNIT FOR PURIFYING GASES | 1991 |
|
RU2028175C1 |
Authors
Dates
1998-01-27—Published
1995-03-16—Filed