FIELD: civil engineering. SUBSTANCE: adjacent panels 1 are interconnected into erection blocks using hinges, as well as are provided with hinged-type thrusts 5. Panel body has traction cables 4 passed through the panels. The cables has stops against motion installed on their ends. The distance between the stops of a cable corresponds to length of cable 4 when the construction is in design position. Installation of an erection block is carried out using lifting mechanism. In so doing, panels take design positions and are pushed apart under gravity. EFFECT: simplified and fast erection. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BUILT-UP STRUCTURE | 1992 |
|
RU2035554C1 |
PREFABRICATED KNOCK-DOWN VAULTED STRUCTURE | 0 |
|
SU1308725A1 |
METHOD OF ERECTION OF SHELLS ON PNEUMATIC FALSEWORK | 1994 |
|
RU2112120C1 |
METHOD FOR INSTALLING UNIT OF SECTIONAL ARCHED STRUCTURE | 1995 |
|
RU2103450C1 |
METHOD TO ERECT TRANSFORMABLE BUILDING OF CULTURAL AND LEISURE INSTITUTION | 2013 |
|
RU2527444C1 |
METHOD OF COLUMNS ASSEMBLY AND DEVICE FOR COLUMNS GRIPPING | 2006 |
|
RU2334067C1 |
LARGE-PANEL BUILDING | 2016 |
|
RU2627436C1 |
METHOD FOR CRANELESS SUPPORT SUPERSTRUCTURE INSTALLATION WITH BRACES | 2018 |
|
RU2706290C1 |
THE METHOD OF ERECTION OF PREFABRICATED MULTI-STOREY REINFORCED CONCRETE FRAME OF A BUILDING | 2015 |
|
RU2617813C2 |
PANEL BLOCK ASSEMBLING DEVICE | 2003 |
|
RU2252304C2 |
Authors
Dates
1995-06-19—Published
1991-12-29—Filed