FIELD: oil production industry. SUBSTANCE: method is aimed at accelerated reformation of watered oil deposit and involving low-permeable interlayers in development. According to method, productive bed is initially subjected to vibro-seismic treatment by means of source of elastic vibrations installed in one of central wells of deposit. This treatment is carried out until watering of recovered product in whole across deposit is reduced by 3-5%. After that, injection of displacing agent into bed is periodically stopped and renewed. In watered oil bed, vibro-seismic treatment substantially (by 2-3 orders) accelerates process of gravitational separation of oil and water. Cyclic injection induces involvement in development of oil reserve concentrated in low-permeable interlayers. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ADDITIONAL DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2105135C1 |
METHOD OF DEVELOPING NONUNIFORM OIL FORMATION | 1998 |
|
RU2149986C1 |
METHOD OF DEVELOPMENT OF FLOODED OIL POOL | 1997 |
|
RU2136863C1 |
METHOD OF OIL POOL WATERFLOODING | 1999 |
|
RU2163966C2 |
METHOD FOR WATERING OF OIL DEPOSIT | 1996 |
|
RU2103488C1 |
METHOD FOR DEVELOPMENT OF WATERED OIL DEPOSIT | 1995 |
|
RU2103489C1 |
METHOD OF TREATING NONUNIFORM OIL BED | 1995 |
|
RU2103484C1 |
METHOD OF OIL POOL DEVELOPMENT WITH WATER-ENCROACHED INTERLAYERS | 1996 |
|
RU2128281C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2105871C1 |
METHOD FOR LEVELLING INJECTIVITY PROFILE OF INJECTION WELLS | 1995 |
|
RU2105140C1 |
Authors
Dates
1998-01-27—Published
1995-06-30—Filed