FIELD: oil producing industry, particularly, methods of waterflooding of oil pools. SUBSTANCE: injection of displacing agent into injection wells is carried out up to pressure rise in formation for 5-10% of running formation pressure before performance of hydraulic fracturing and during periodic stopping of injection. In so doing, duration of injection of displacing agent is determined with due consideration to distance between injection and producing wells and piezoconductivity of nonwaterflooded formation. EFFECT: higher efficiency of method due to increased sweep of formation waterflooding and development of low-permeable interlayers.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING NONUNIFORM OIL FORMATION | 1998 |
|
RU2149986C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2103486C1 |
METHOD FOR WATERING OF OIL DEPOSIT | 1996 |
|
RU2103488C1 |
METHOD OF DEVELOPMENT OF FLOODED OIL POOL | 1997 |
|
RU2136863C1 |
METHOD OF OIL POOL DEVELOPMENT WITH WATER-ENCROACHED INTERLAYERS | 1996 |
|
RU2128281C1 |
METHOD FOR DEVELOPMENT OF WATERED OIL DEPOSIT | 1995 |
|
RU2103489C1 |
METHOD FOR DEVELOPMENT OF TERRIGENOUS OIL BED | 1994 |
|
RU2085711C1 |
METHOD OF DEVELOPING AN OIL DEPOSIT | 0 |
|
SU1553658A1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2105873C1 |
COMBINED METHOD OF EQUALIZING OF OIL DISPLACEMENT FRONT | 1998 |
|
RU2136860C1 |
Authors
Dates
2001-03-10—Published
1999-01-12—Filed