FIELD: oil production industry. SUBSTANCE: this can be used in development of oil deposits with large number of stopped wells. According to method, working agent is injected through injection wells, and oil is recovered through producing wells, and some wells are stopped. Selected in deposit is development section with producing and injection wells having hydrodynamic connection between each other. Separated in this section is zone of higher oil saturation, filtration flow is formed through zone of higher oil saturation by putting into operation earlier stopped producing wells located beyond zone of higher oil saturation over its perimeter and within its limits. In addition, introduced in operation are earlier stopped injection wells located behind zone of higher oil saturation. Initially, injection wells are put into operation, then earlier stopped producing wells are started to operate. EFFECT: high efficiency. 2 cl, 1 dwg, 4 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2087686C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1998 |
|
RU2146328C1 |
METHOD FOR OIL DEPOSIT DEVELOPMENT BASED ON SYSTEM ADDRESS ACTION | 2012 |
|
RU2513787C1 |
METHOD OF DEVELOPMENT OF FLOATING OIL POOL | 1994 |
|
RU2076203C1 |
METHOD FOR DEVELOPMENT OF OIL FIELD | 1991 |
|
RU2012784C1 |
METHOD FOR DEVELOPMENT OF HYDROCARBON DEPOSIT | 1995 |
|
RU2095550C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT WITH LOW-PERMEABLE CLAY-BEARING RESERVOIR | 1996 |
|
RU2105141C1 |
METHOD FOR DEVELOPING OIL DEPOSIT | 1993 |
|
RU2065031C1 |
METHOD FOR CONTROLLING OVER DEVELOPMENT OF OIL DEPOSIT WITH STRATA OF VARIOUS PERMEABILITY | 1992 |
|
RU2061856C1 |
METHOD FOR DEVELOPMENT OF VISCOUS OIL POOL | 1993 |
|
RU2043488C1 |
Authors
Dates
1998-02-20—Published
1996-03-14—Filed