FIELD: gas industry; making of underground storage for liquid oil products. SUBSTANCE: proposed method includes drilling and fastening of well, defrosting of permafrost in noncased interval of well by delivering warmer, maintaining water temperature in reservoir not higher than temperature corresponding to maximum density of water plus 4 C to form stable roof and delivering defrosted rock to surface along working column. Novelty is use of superheated steam as warmer. Water formed at thawing of ice and condensation of steam is periodically pumped out and returned into reservoir in form of steam. Water temperature in reservoir is maintained by regulating delivery of steam. EFFECT: enlarged operating capabilities. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
BOREHOLE DRILLING IN HIGH-PLASTIC ROCKS IN ROCK SALT DEPOSITS | 0 |
|
SU1701606A1 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK SALT FORMATIONS AND UNDERGROUND RESERVOIR DESIGNS FOR IMPLEMENTING THE SAME | 1991 |
|
RU2068805C1 |
METHOD FOR BUILDING UNDERGROUND RESERVOIR IN DEPOSITS OF ROCK SALT | 1991 |
|
RU2068806C1 |
METHOD OF CONSTRUCTION OF SUBSURFACE RESERVOIRS IN PERMAFROST ROCKS | 0 |
|
SU1835380A1 |
DEVICE FOR SATURATION OF LIQUID WITH GAS | 1993 |
|
RU2050955C1 |
0 |
|
SU1778046A1 | |
METHOD OF UNDERGROUND RESERVOIRE CREATION IN FROZEN SOLIDS | 2006 |
|
RU2327624C1 |
DEVICE FOR BUILDING UNDERGROUND RESERVOIRS HAVING PREDETERMINED CONFIGURATION IN MINE SALT | 0 |
|
SU1792893A1 |
APPARATUS FOR LIQUID SATURATION WITH GAS | 1993 |
|
RU2057579C1 |
METHOD FOR CONSTRUCTION OF UNDERGROUND TANKS IN A FROZEN SOIL | 0 |
|
SU1835379A1 |
Authors
Dates
1998-03-10—Published
1992-07-08—Filed