FIELD: building underground reservoirs by dissolving rock salt deposits. SUBSTANCE: brine is taken from dissolving chamber below the level of dissolver inlet to the chamber. Ejector device is located at this level. Flow passage of the ejector is installed between operating pipe strings. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR BUILDING UNDERGROUND RESERVOIRS HAVING PREDETERMINED CONFIGURATION IN MINE SALT | 0 |
|
SU1792893A1 |
DEVICE FOR CONSTRUCTION OF UNDERGROUND RESERVOIR IN SOLUBLE FORMATIONS | 1993 |
|
RU2041143C1 |
METHOD OF DELIVERY OF GASEOUS NON-SOLVENT AT ERECTION OF UNDERGROUND RESERVOIRS IN SOLUBLE ROCK | 1997 |
|
RU2141440C1 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK SALT FORMATIONS AND UNDERGROUND RESERVOIR DESIGNS FOR IMPLEMENTING THE SAME | 1991 |
|
RU2068805C1 |
METHOD FOR MINING DEPOSITS OF SOLUBLE ROCKS OCCURRING UNDER BEDS OF LESS SOLUBLE ROCKS | 1992 |
|
RU2042586C1 |
METHOD OF CONSTRUCTION OF TANKS IN LIMITED-THICKNESS ROCKS SALT FORMATIONS | 2001 |
|
RU2213032C2 |
METHOD OF MAKING UNDERGROUND CHAMBER IN ROCK SALT FORMATIONS | 0 |
|
SU1113520A1 |
METHOD FOR UNDERGROUND RESERVOIR BUILDING IN ROCK SALT | 2003 |
|
RU2264965C2 |
METHOD OF AND DEVICE FOR CONSTRUCTION OF TANKS IN ROCK SALT | 2001 |
|
RU2213033C2 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK-SALT FORMATIONS | 2003 |
|
RU2236579C1 |
Authors
Dates
1996-11-10—Published
1991-04-16—Filed