FIELD: oil production industry. SUBSTANCE: according to method, at initial stage of developing oil deposit drilled are both producing and injection wells. As injection wells are being readied working agent is injected into them so that bottom-hole pressure of injection wells is not higher than pressure of hydraulic fracturing of oil bed. With that, producing wells are preserved with no product recovery from them. Injection of working agent is continued until pressure in bed reaches determined value P. Value P is determined basing on collecting properties of bed and viscosity of bed oil with knowing total daily production rate through oil deposit. EFFECT: higher efficiency. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL FIELD WITH BOTTOM WATER | 1991 |
|
RU2012785C1 |
METHOD FOR DEVELOPMENT OF OIL GAS FIELDS | 1991 |
|
RU2049913C1 |
METHOD OF DEVELOPMENT OF MULTIBED OIL DEPOSITS | 2005 |
|
RU2338059C2 |
METHOD FOR EXTRACTING MULTI-BED OIL DEPOSIT | 2006 |
|
RU2290493C1 |
METHOD FOR MULTIPAY OIL FIELD DEVELOPMENT | 2005 |
|
RU2307923C2 |
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2459938C1 |
DEVELOPMENT METHOD OF OIL DEPOSITS WITH CHANGEOVER TO FORCED OPERATION CONDITIONS AT FINAL STAGE | 2012 |
|
RU2494235C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2000 |
|
RU2167276C1 |
METHOD OF OIL-FIELD DEVELOPMENT WITH MAINTENANCE OF OIL LEVEL PRODUCTION BY MEANS OF FORCED MODE USAGE AT CLOSING STAGE | 2012 |
|
RU2498054C1 |
METHOD FOR REGULATING DEVELOPMENT OF OIL DEPOSIT | 2021 |
|
RU2753215C1 |
Authors
Dates
1998-03-20—Published
1993-06-16—Filed