FIELD: oil producing industry; applicable in development of oil deposits with drilling of additional wells. SUBSTANCE: method involves spacing of producing and injection wells in alternating rows. At initial stage of development, additional producing wells are located round each producing well in well pattern. In this case, bottom holes of additional wells are located round each producing well in well pattern to form single structural member due to location of bottom holes of additional producing wells within bottom-hole zone of each producing well which is calculated by analytical formula. EFFECT: intensified oil recovery at initial stage of oil deposit development. 3 dwg, 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2476667C1 |
METHOD OF OIL FIELD DEVELOPMENT | 2014 |
|
RU2554971C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 2015 |
|
RU2578090C1 |
DEVELOPMENT METHOD OF MULTI-OBJECT OIL DEPOSIT (VERSIONS) | 2018 |
|
RU2696690C1 |
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513965C1 |
OIL DEPOSIT EXTRACTION METHOD (VARIANTS) | 2003 |
|
RU2254457C1 |
METHOD OF DEVELOPMENT OF OIL FIELD WITH NONUNIFORM RESERVOIRS AND DIFFICULTLY RECOVERABLE OIL RESERVES | 2002 |
|
RU2215128C1 |
METHOD OF DEVELOPING OIL DEPOSIT WITH SEVERAL OIL ACCUMULATIONS LOCATED ONE ABOVE ANOTHER | 2010 |
|
RU2441145C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 2015 |
|
RU2580562C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT WITH HORIZONTAL WELLS | 2011 |
|
RU2474678C1 |
Authors
Dates
2001-05-20—Published
2000-05-15—Filed