FIELD: oil and gas industry.
SUBSTANCE: development is performed in three stages according to the method. At the first stage, working agent is pumped with increase in several stages of time in 4-12 months. The term is determined depending on duration of positive effect. Increased is performed by 5-30% before initial pressure, but not exceeding hydraulic fracture pressure of that deposit formation. Bottom-hole pressure is maintained at initial level in production wells. Duration of the first stage is determined to a local extremum point of a graph of value of relative efficiency of flushing in time. Then, the second stage is chosen, at which pumping of working agent is performed with reduction in several stages - once in 4-12 months by 5-30%. Production wells with water content of more than 95% are shut off simultaneously. On the rest production wells there reduced is bottom-hole pressure to maintain constant pressure drop between injection and production wells. Bottom-hole pressure in production wells is reduced to gas saturation level; after that, the final stage is chosen. For that purpose, injection wells are shut off, and in production wells there performed is forced liquid takeoff by reducing bottom-hole pressure below saturation pressure by 30-40%. Production wells with water content that is higher than maximum allowable level or well flow rates below economic efficiency are shut off.
EFFECT: reduction of material costs and improvement of oil extraction coefficient due to possibility of action on the whole deposit.
1 tbl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL-FIELD DEVELOPMENT WITH MAINTENANCE OF OIL LEVEL PRODUCTION BY MEANS OF FORCED MODE USAGE AT CLOSING STAGE | 2012 |
|
RU2498054C1 |
CONTROL METHOD OF OIL POOL DEVELOPMENT | 2014 |
|
RU2558093C1 |
DEVELOPMENT METHOD OF NON-HOMOGENEOUS OIL DEPOSIT | 2011 |
|
RU2471971C1 |
CONTROL METHOD OF OIL POOL DEVELOPMENT | 2013 |
|
RU2528185C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2003 |
|
RU2247829C1 |
METHOD OF DROWNED OIL POOL DEVELOPMENT AT LATE STAGE | 2001 |
|
RU2197604C2 |
CONTROL METHOD OF OIL POOL DEVELOPMENT | 2013 |
|
RU2521245C1 |
METHOD OF DEVELOPING NONUNIFORM OIL DEPOSIT | 2001 |
|
RU2194153C2 |
METHOD FOR EXTRACTING WATERED OIL DEPOSIT AT LATER STAGE BY MEANS OF GAS-HYDRODYNAMIC INFLUENCE | 2003 |
|
RU2236573C1 |
METHOD FOR EXTRACTING NON-HOMOGENEOUS OIL DEPOSIT | 2003 |
|
RU2235867C1 |
Authors
Dates
2013-09-27—Published
2012-03-23—Filed