FIELD: oil production industry. SUBSTANCE: this can be used for control and projecting in development of deposits. According to method, determined is balance reserve of oil with respect to well in which bed pressure is to be determined. Also determined are total amount of liquid recovered from well, accumulated volume of displacing agent being injected into well, and total amount of its recovery from producing well. Bed pressure is determined by using calculating formula presented in description of invention. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
PETROLEUM DEPOSIT DEVELOPMENT METHOD | 2002 |
|
RU2224100C1 |
METHOD OF OIL WELLS OPERATION | 1998 |
|
RU2151276C1 |
METHOD FOR DETERMINING CURRENT FORMATION PRESSURE IN AN OPERATING WELL OF A TOURNAISIAN-FAMENNIAN DEPOSIT WITHOUT ITS STOPPING | 2019 |
|
RU2715490C1 |
METHOD FOR RECOVERY OF RESIDUAL OIL RESERVES | 2012 |
|
RU2511151C2 |
METHOD CONTROLLING DEVELOPMENT OF OIL POOL | 1999 |
|
RU2144133C1 |
METHOD OF DEVELOPING OIL DEPOSIT WITH CARBONATE COLLECTOR | 1997 |
|
RU2135751C1 |
DEVELOPMENT METHOD OF OIL FIELD | 2008 |
|
RU2386798C1 |
METHOD OF PRODUCING WELLS OPERATION | 1998 |
|
RU2151275C1 |
METHOD OF DEVELOPMENT OF WATER-ENCROACHED OIL DEPOSIT | 2000 |
|
RU2169256C1 |
METHOD FOR MAINTENANCE OF MULTILAYER OIL FIELDS | 1998 |
|
RU2151279C1 |
Authors
Dates
1998-03-20—Published
1996-07-29—Filed