FIELD: oil production. SUBSTANCE: method may be used in maintenance of continuous optimal differential pressure on formation, reduction of probability of formation of paraffin and hydrate plugs. The method provides for withdrawal of fluid from formation into well, its overflow into tubing string and lifting to surfaces. Fluid is overflown into tubing string under critical conditions of flow corresponding to preset fluid flow rate and to value of pressure differential acted on formation. Pressure in tubing string is maintained at level corresponding to minimum permissible according to conditions of product recovery in oil field. EFFECT: higher efficiency of formation energy utilization. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MAINTENANCE OF MULTILAYER OIL FIELDS | 1998 |
|
RU2151279C1 |
METHOD OF OIL WELLS OPERATION | 1998 |
|
RU2151276C1 |
METHOD OF EXPLOITATION OF OIL POOL ( VERSIONS ) | 1999 |
|
RU2162935C2 |
NATURAL PRESSURE GAS LIFT UNIT WITH PLUNGER LIFT | 1995 |
|
RU2070278C1 |
METHOD OF OPERATING WATERED GAS WELLS | 2018 |
|
RU2687706C1 |
METHOD FOR DETERMINATION OF GAS FLOW RATE AND GAS FACTOR OF WELLS PRODUCT | 2010 |
|
RU2459953C1 |
METHOD FOR SELECTIVE ANALYSIS OF SEPARATE FORMATIONS OF COAL-METHANOL WELLS | 2015 |
|
RU2578143C1 |
METHOD FOR EXTRACTING OF OIL FROM GAS WELLS WITH OIL-BEARING DEPOSITS | 2000 |
|
RU2232877C2 |
METHOD OF TAKING SAMPLES OF GAS-LIQUID FLOW AND DEVICE FOR ITS EMBODIMENT | 1995 |
|
RU2091579C1 |
METHOD FOR OPERATION OF FLOODING OIL DEPOSIT | 1993 |
|
RU2081302C1 |
Authors
Dates
2000-06-20—Published
1998-04-03—Filed