FIELD: oil and gas production industry. SUBSTANCE: this is intended for development of wells which are provided with packer. Application of this method prevents fouling of productive bed, simplifies generation of inflow and reduces duration of well activation period. According to method, undertaken is lowering of lift pipes with packer, clay mud is replaced with lighter solution, inflow is stimulated. Then, packer is put into operation. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF WELL COMPLETION | 2002 |
|
RU2220280C1 |
METHOD OF WELL COMPLETION | 2002 |
|
RU2215137C1 |
DESIGN OF WELL | 1996 |
|
RU2101472C1 |
WELL COMPLETION METHOD AFTER WORKOVER | 2022 |
|
RU2801197C1 |
METHOD FOR WELL COMPLETION | 2003 |
|
RU2235868C1 |
FLOW SAFETY VALVE OF FORMATION TESTER | 1998 |
|
RU2147674C1 |
PACKER | 1996 |
|
RU2112862C1 |
PACKER | 1996 |
|
RU2105863C1 |
METHOD FOR HYDRAULIC RESERVOIR FRACTURING INSIDE GAS WELL | 2005 |
|
RU2306412C1 |
METHOD FOR CONSTRUCTION OF WELLS | 1996 |
|
RU2109909C1 |
Authors
Dates
1998-04-27—Published
1996-04-15—Filed