FIELD: oil and gas well industry, particularly to stimulate hydrocarbon influx in gas and gas-condensate wells.
SUBSTANCE: method involves killing well; remanifolding well head; removing production tubing from well and lowering flow string provided with high-pressure packer in well; remanifolding well head; setting packer; performing hydraulic fracturing of reservoir and developing well. Before hydraulic reservoir fracturing flow sting with high-pressure packer is additionally provided with circulation valve and underground equipment necessary for further well operation after hydraulic fracturing termination. Cylindrical nipple for hermetical production tree T-member isolation from working strings thereof is arranged inside production tree. Here cylindrical nipple is fastened between upper flange of buffer gate and production tree T-member buffer or is screwed into upper hanger thread of flow string of production tree cap. Hydraulic reservoir fracturing is carried out in presence of production tree installed at well head and calculated to working pressure of well exploitation. After hydraulic fracturing termination flow string with high-pressure packer, circulation packer and other underground equipment necessary for well exploitation is left in well for total next well exploitation time period. Cylindrical nipple is removed from production tree T-member. Well is developed by circulation valve opening due to technological well liquid substitution for light-weight liquid.
EFFECT: decreased time of assembly works before and after hydraulic reservoir fracturing, decreased time of well inaction.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDROLIC FRACTURING OF FORMATION OF CONDENSATE BOREHOLE | 2006 |
|
RU2324050C2 |
METHOD FOR HYDRAULIC FRACTURING OF RESERVOIR IN GAS WELL | 2005 |
|
RU2301885C1 |
METHOD FOR UPGRADING GAS-CONDENSATE WELL | 2016 |
|
RU2651716C1 |
WELL COMPLETION METHOD AFTER WORKOVER | 2022 |
|
RU2801197C1 |
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION | 2016 |
|
RU2614998C1 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
OIL PRODUCING WELL DEVELOPMENT AND OPERATION METHOD | 2011 |
|
RU2471975C2 |
METHOD OF CREATION AND OPERATION OF UNDERGROUND GAS STORAGE IN DEPOSITS OF ROCK SALT | 2018 |
|
RU2707478C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST AREAS | 2008 |
|
RU2379496C1 |
RECOVERY OF SELF-SQUEEZING GAS WELL WITH ABNORMALLY LOW SEAM PRESSURE | 2013 |
|
RU2539060C1 |
Authors
Dates
2007-09-20—Published
2005-12-21—Filed