FIELD: oil and gas production industry. SUBSTANCE: according to method, well strainer is lowered into required interval of well in pump-compressor or other pipes. Located on aforesaid pipes is self-sealing collar. Positioned between strainer and self-sealing collar is circulation valve. Sloughing of sand suspension is effected by washing liquid under hydraulic pressure. Sloughing of sand suspension is maintained by periodic pumping of washing liquid through circulation valve. At moment of sand suspension sloughing, self-sealing collar is fixed above productive bed. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL OPERATION AND DEVICE FOR IMPLEMENTATION THEREOF | 2017 |
|
RU2704087C2 |
METHOD AND DEVICE FOR SAND PLUG REMOVAL FROM WELL BOTTOM AND GRAVEL FILTER AGGREGATION | 2002 |
|
RU2267005C2 |
METHOD FOR BOREHOLE BOTTOM FLUSHING | 2013 |
|
RU2527433C1 |
METHOD AND DEVICE FOR CLEANING BOTTOM OF WELL DURING ITS OPERATION | 2002 |
|
RU2212521C1 |
METHOD AND DEVICE FOR WELL FLUSHING | 2009 |
|
RU2405914C1 |
ARRANGEMENT FOR FLUSHING SAND PLUGS | 0 |
|
SU1081334A1 |
DEVICE FOR WELL CLEANING OF SAND PLUG | 2005 |
|
RU2298085C1 |
DEVICE FOR WELL CLEANING OF SAND PLUG | 2005 |
|
RU2298643C1 |
PUMP-VACUUM DEVICE FOR WELL CLEANING OF SAND PLUG | 2006 |
|
RU2314411C1 |
PROCESS OF INTENSIFICATION OF PRODUCTION OF GAS | 2000 |
|
RU2179628C2 |
Authors
Dates
1998-05-10—Published
1996-04-24—Filed