FIELD: soil or rock drilling; mining.
SUBSTANCE: group of inventions relates to mining, oil and gas industries, in particular to well operation, complicated by the presence of sand and asphalt-resin-paraffin deposits. According to the method, a composite string is lowered into the well. It is equipped in lower part with two independent channels - one for communication of productive formation with well head and production of well product at wellhead, and the other - for wellhead communication with productive formation and injection into the last working agent for treatment of productive formation. Each of the independent channels is equipped with a normally open valve to allow flow of the corresponding fluid in the corresponding direction. Method includes multiple alternation of cycles of production of formation at well head with treatment of productive formation. Duration of cycles, pressure of circulation of each of the fluids and flow rate of each of the fluids from time to time are changed. Productive formation response is taken into account.
EFFECT: group of inventions can be used to intensify inflow.
11 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR WELL OPERATION | 2009 |
|
RU2419718C1 |
WELL PRODUCTION METHOD | 2007 |
|
RU2379485C2 |
DEVICE FOR CONSTRUCTION OF GRAVEL-PRECOAT FILTER | 2012 |
|
RU2514077C2 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION | 2007 |
|
RU2376453C2 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION, PRESSURE IMPULSE GENERATOR | 2007 |
|
RU2376455C2 |
HYDROCARBON EXTRACTION METHOD | 2009 |
|
RU2393346C1 |
METHOD OF SYNERGETIC REACTANT-IMPULSE-WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND PLANT FOR ITS IMPLEMENTATION | 2010 |
|
RU2462586C2 |
METHOD FOR REMOVING SAND-CLAY PLUG IN WELL AND ITS DEVELOPMENT UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2013 |
|
RU2544944C2 |
METHODS FOR EXPLOITING OIL EXTRACTING WELLS | 2003 |
|
RU2225938C1 |
METHOD FOR WELL BOTTOM ZONE TREATMENT | 2004 |
|
RU2270913C2 |
Authors
Dates
2019-10-23—Published
2017-11-15—Filed