FIELD: oil production; preparation of mixture with preset characteristics and delivery of mixture to treated formation. SUBSTANCE: method includes injection into tubing string run into well of displacement agent based on nitrogen and liquid containing surfactants, gel-forming agents and acids. Quantities of components and their ratios are regulated by weighing batcher located on the lower end of internal pipe directly under packer secured to internal well of casing. EFFECT: higher efficiency. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE OF HYDRODYNAMIC EFFECT ONTO RESERVOIR AND ASSEMBLY FOR IMPLEMENTATION OF THIS PROCEDURE | 2007 |
|
RU2360103C1 |
PROCEDURE FOR HYDRO-DYNAMIC INFLUENCE ON RESERVOIR AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2431738C1 |
METHOD FOR PROCESSING THE BOTTOM-HOLE ZONE OF THE FORMATION AND A JET PUMP AS PART OF A DEVICE FOR IMPLEMENTING THE METHOD | 2022 |
|
RU2783932C1 |
DOWN-HOLE INSTALLATION FOR EFFECT ON BOTTOMHOLE FORMATION ZONE | 2011 |
|
RU2460869C1 |
METHOD FOR TREATMENT OF BOTTOMHOLE ZONE AND DEVELOPMENT OF WELLS AND JET INSTALLATION FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2822423C2 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
METHOD OF DEVELOPMENT OF OIL WELL AFTER CARRYING OUT THE HCT | 2020 |
|
RU2727279C1 |
DEVICE FOR COMPLETION AND TREATMENT OF WELL | 1991 |
|
RU2023146C1 |
METHOD FOR PRODUCING THERMOPLASTIC WOOD (VERSIONS) | 1995 |
|
RU2091217C1 |
ARRANGEMENT FOR COMPLETING,TO AND RUNNING WELLS | 0 |
|
SU1121404A1 |
Authors
Dates
1998-05-20—Published
1994-12-15—Filed