FIELD: cranes. SUBSTANCE: the crane-reloader supports are fixed in the design position with the aid of metalworks of auxiliary supports of the trestle work, on which the bridge is assembled. The fixture is furnished with tackle- blocks with cross-pieces and mounting winches engageable with the tackle-blocks for hoisting the bridge of the crane-reloader from the auxiliary trestle work to the design position to the design supports. EFFECT: reduced time of mounting, reduced labour content, enhanced technical culture of work owing to exclusion of manual labour in linking and reeving of guy tackle-blocks and wind braces, enhanced reliability. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DISASSEMBLING TRANSFER CRANES | 2011 |
|
RU2463241C1 |
METHOD OF DISMANTLING LOADER CRANES | 2017 |
|
RU2700300C2 |
MOBILE HOIST FOR ASSEMBLING, DISMANTLING AND REARRANGING OVERHEAD CRANES | 2013 |
|
RU2561177C2 |
DEVICE FOR ERECTION OF LONG VERTICAL STRUCTURES | 0 |
|
SU1693219A1 |
DEVICE FOR INSTALLATION OF ELONGATED UPRIGHT STRUCTURES | 0 |
|
SU1682503A1 |
METHOD OF MOUNTING OF TOWER AND MAST STRUCTURES BY MEANS OF CRANK MECHANISM | 1995 |
|
RU2091549C1 |
METHOD AND APPARATUS FOR ERECTING A TOWER | 0 |
|
SU1034987A1 |
METHOD OF MOUNTING GIRDERS OF BRIDGE SPAN STRUCTURE | 0 |
|
SU1084355A1 |
METHOD FOR MOUNTING LARGE-SPAN COVERINGS WITH PUSHING FORCE | 2021 |
|
RU2789028C1 |
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
Authors
Dates
1998-05-27—Published
1996-04-30—Filed