FIELD: oil and gas production industry. SUBSTANCE: according to method, bottom-hole zone of bed is treated by hydrocarbon solvent which is produced directly in bottom-hole zone of bed. For this purpose, level of liquid in producing well is lowered down to interval of perforations. Zone of well is vacuumized to pressure of 13.3-1.33 kPa and this pressure is maintained during 30-40 min. Then, pressure is sharply increased to atmospheric level. This process is repeated 2-3 times until liquid output is increased. Aforesaid method allows for increasing productivity of well due to enlarged recovery of liquid and reduction of expenses for buying and delivery of reagents and also due to elimination of operations connected with raising and lowering of underground equipment. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF OIL POOL | 1999 |
|
RU2171369C2 |
METHOD OF INCREASE OF WELL PRODUCTIVITY | 1999 |
|
RU2172399C2 |
METHOD FOR DEVELOPMENT OF OIL POOL | 1993 |
|
RU2053353C1 |
METHOD OF WELL OPERATION | 1997 |
|
RU2142554C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION | 2007 |
|
RU2376453C2 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION, PRESSURE IMPULSE GENERATOR | 2007 |
|
RU2376455C2 |
METHOD TO KILL WELLS | 1992 |
|
RU2046932C1 |
METHOD OF SYNERGETIC REACTANT-IMPULSE-WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND PLANT FOR ITS IMPLEMENTATION | 2010 |
|
RU2462586C2 |
METHOD FOR DEVELOPMENT OF MASSIVE-TYPE DEPOSIT | 1995 |
|
RU2095551C1 |
TREATMENT METHOD OF BOTTOM-HOLE FORMATION ZONE | 2013 |
|
RU2513586C1 |
Authors
Dates
1998-06-10—Published
1996-06-18—Filed