FIELD: chemical industry: metallurgical industry. SUBSTANCE: quantity of electric power spent by furnace heater during first cycle of control and first cycle duration are measured. Measurement results are used for calculation of heater equivalent power in front cycle. This power is taken as present one form beginning of second cycle up to present moment at which heater power and actual quantity of electric power are measured. Then preset quantity of electric power is calculated. Power at present moment of second cycle is compared with preset power. Comparison results are used for forming of auxiliary control signal law. Preset and actual quantities of electric power are compared, and auxiliary control signal law is formed on basis of comparison results. EFFECT: higher accuracy of maintaining temperature on preset level. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR AUTOMATIC TEMPERATURE CONTROL IN APPARATUS WITH HEATING JACKET | 1999 |
|
RU2167449C2 |
METHOD FOR AUTOMATIC TEMPERATURE ADJUSTMENT WITH DECREASED DYNAMIC ERROR IN APPARATUS WITH HEATING COVER | 2002 |
|
RU2259580C2 |
METHOD FOR AUTOMATIC ADJUSTMENT OF SURFACE TEMPERATURES FIELD IN MACHINE WITH HEATING COVER | 2002 |
|
RU2246126C2 |
METHOD FOR AUTOMATIC CONTROL OF LEVEL OF WORKING LIQUID IN TANK | 1998 |
|
RU2131084C1 |
BEE FAMILY HEATING APPARATUS | 1996 |
|
RU2111655C1 |
MATRIX-TYPE COMMUNICATION NETWORK MODULE | 2000 |
|
RU2168755C1 |
FORWARD HIGH-ORDER-POSITION ADDERSUBSTRACTOR BUILT AROUND NEURONS | 2002 |
|
RU2205444C1 |
MICROCONTROLLER NETWORK | 1999 |
|
RU2168198C1 |
UNIT OF MICROCONTROLLER NETWORK | 1999 |
|
RU2151421C1 |
MICROPROGRAM CONTROL UNIT | 1997 |
|
RU2111528C1 |
Authors
Dates
1998-07-10—Published
1995-04-12—Filed