FIELD: oil producing industry in elimination of leakage of casing strings. SUBSTANCE: method includes injection into well of viscoelastic compound and cement slurry through tubing string. This injection is carried out with well annular space opened. Vibroelastic compound is located below the lower boundary of leaky part of casing string. Prior to injection of cement slurry, tubing string is lifted to position its end at the level of leaky part of casing string. After injection tubing string is also lifted above upper boundary of cement slurry. Prior to injection of cement slurry, the process is let stand. Then displacing fluid is injected with well annular space closed. Amount of this fluid equals to 1.5 volumes of part of tubing string which was immersed in cement slurry. EFFECT: higher efficiency. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATION OF GAS INTERFLOWS IN HOLE CLEARANCE | 1998 |
|
RU2126880C1 |
METHOD OF CLEANING THE PRODUCING FORMATION CHANNELS | 1998 |
|
RU2121563C1 |
METHOD FOR SELECTIVE ISOLATION OF WATER INFLOWS IN OIL WELLS | 1999 |
|
RU2136879C1 |
WELL KILLING METHOD | 1999 |
|
RU2136855C1 |
PROCESS OF ISOLATION OF WATER INFLOWS IN OPERATIONAL WELLS | 1999 |
|
RU2144136C1 |
PROCEDURE FOR REPAIR OPERATIONS IN WELL | 2009 |
|
RU2423599C2 |
METHOD OF INCREASE OF OIL RECOVERY FROM OIL FIELDS DEVELOPED BY FLOODING | 1999 |
|
RU2136862C1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
METHOD OF LIQUIDATION OF LEAKAGE OF CASING PIPES IN A WELL AND PIPES OF UNDERGROUND PIPELINE | 2017 |
|
RU2659297C1 |
GAS AND GAS CONDENSATE WELLS WITH LEAKY CASING STRING REPAIR METHOD | 2008 |
|
RU2382171C1 |
Authors
Dates
1998-11-10—Published
1998-03-27—Filed